Solar construction progress and climate risk, measured from drone and satellite

agragent counts what is installed on a PV plant block by block from drone orthomosaics, reconciles it with the schedule, and tracks the heat, wind and rain exposure of the plant once it is running.

Solar Star PV plant · Rosamond, California (public aerial imagery)
Solar Star PV plant · Rosamond, California (public aerial imagery) · © Esri World Imagery / Copernicus Sentinel-2

What agragent measures

Progress per block

Piles, trackers, tables and modules counted with computer vision on every drone flight.

Reconciled with the schedule

Measured progress compared with the daily site report and the baseline schedule, so delays show up per block.

Flight to flight

What changed since the last flight and where crews worked, on one map.

Climate exposure in operation

Heat, wind, rain and dust history at the site, with up to 80 years of climate data.

Answers with numbers

Ask the AI agent "how far along is block 12?" and get the count, the plan and the gap.

How it works

Upload each flight

An RGB orthomosaic (GeoTIFF) from any mapping drone, or aerial imagery for a coarser view.

Detect and reconcile

agragent segments the structures, counts them per block and compares them with the plan.

Review and ask

Progress maps, block tables and an AI agent that explains the gaps.

Real example: Solar Star PV plant · Rosamond, California (public aerial imagery)

Tracker tables segmented automatically on 0.25 m/px aerial imagery. The same pipeline runs on drone orthomosaics, where it reaches pile and module level. We also run it for a utility-scale plant under construction in the Atacama Desert (client project, anonymous), reconciling each flight with the daily site report and the baseline schedule.

490tracker tables detected
5.7 haof PV modules mapped
0.25 m/pxaerial resolution

Client projects are shown without naming the client.

Data behind it

  • Drone orthomosaics (cm-level) from your flights
  • Esri World Imagery aerial basemap (0.25–1.1 m/px)
  • Sentinel-2 L2A, 10 m every 5 days, for site-wide change
  • Open-Meteo hourly and historical weather back to the 1940s

Frequently asked questions

What drone data do I need?

An RGB orthomosaic in GeoTIFF from any standard mapping drone. A few centimetres per pixel is enough to count piles, trackers and modules.

Does it work without a drone?

Yes, at a coarser level. Public aerial imagery is enough to map tables and blocks, as in the Solar Star example; pile and module counts need drone imagery.

Can it compare progress with my schedule?

Yes. Measured progress is reconciled with the daily site report and the baseline schedule exported from your planning tool, block by block.

What happens after construction?

The same site keeps its climate record: heat, wind and rain exposure, plus satellite change detection around the plant.

See it on your own site

Draw your site on the map or send us your imagery. No installation required.